Darkness Resurgence: I Have a Mobile Castle

The entire world has become a dark arena, with various terrifying creatures crawling out from hell.

Hordes of zombies roam, bone demons run rampant. Is humanity on the verge of destruction, a...

Chapter 149 Yin Long Leads the Team

The tentacle monster broke through the constraints of the land, rushed out of the ground, and attacked the Black Cavalry fiercely.

In an instant, more than twenty Black Cavalry soldiers were beaten into a pulp, and blood flowed like a river on the ground.

General Black was startled and, with the protection of the people around him, managed to escape from the tentacle monster's attack range.

But the other Black Knights were not so lucky.

They were scrambling to deal with the tentacle monster's attacks and kept retreating.

But then, the ground beneath their feet suddenly became empty, and another tentacle monster roared out.

These two tentacle monsters, covered with barbs, were standing one in front and one behind, blocking nearly half of the Black Cavalry in the middle.

You hit me and I hit you, and we finally beat these black cavalry into the ground.

“What the fuck is this!!!”

The Black Cavalry stayed in their own camp all the time, and apart from hunting some dark creatures in Area B, they rarely explored outside.

They had never seen such a dark creature as the tentacle monster.

The tentacle monster, with a combat power of 70 points, is considered a relatively strange and deformed species among dark creatures. It is powerful and has much greater destructive power than the bone demon.

Before this, Xia Mu saw the two tentacle monsters hidden underground in the ruins through the Demon-Breaking Eyes and had already planned everything.

He found a smooth stone pillar, carved some words on it, and hid it aside.

Seeing that the Bone Demon was easily dealt with by the Black Cavalry, he erected the stone pillar and successfully attracted the attention of the Black Cavalry and others.

Originally, he planned to use the Kitetsu sword to chop the stone pillar when the Black Cavalry came forward to take a closer look, thereby awakening the two tentacle monsters underground.

However, unexpectedly, this group of Black Cavalry was so smart that they thought the words on the stone pillar were the work of their enemy, the Three Stone Gang. They angrily pushed the stone pillar down and successfully awakened the two tentacle monsters underground.

This actually saved Xia Mu a lot of trouble.

Seeing that half of the Black Cavalry were wiped out by the tentacle monsters, he chuckled and continued to observe the Black Cavalry's reaction.

Even if all these guys who treated human life as worthless and had completely lost their humanity died, Xia Mu would not even frown.

Ever since he heard Xu Xin talk about the experiences of the girls in those bungalows in the Black Cavalry's second camp, he had already sentenced the Black Cavalry to death in his heart.

If such a dirty organization can continue to survive in the world, Xia Mu may not be able to sleep well.

"Damn, this thing has such a thick skin, I can't even hit it!"

"No, I just spent too much mental energy dealing with those high-level corpses. Now I can't awaken the power of elements!"

As the Black Cavalry screamed, the members who barely escaped were about to launch a counterattack, but they found that their attack was like a tickle to the two huge tentacle monsters.

Xia Mu knew very well how tough the tentacle monster's skin was.

This thing is more prickly than a hedgehog, with its most fragile heart pressed under its body. Unless it is knocked over and someone finds the location of its heart and stabs it, it is basically impossible to kill it.

This is the power of intelligence.

Without this information, no matter how strong you are or how many people you have, you will be unable to do anything about it.

General Hei's face turned pale.

Seeing his men being smashed into pieces by the tentacle monster one by one, he angrily cursed Qian Sanshi's name, then waved his hand helplessly and fled in a hurry with the remaining half of the troops covered in dust.

Xia Mu's goal had actually been achieved by weakening half of the Black Cavalry.

He also didn't think that he could wipe out the most powerful organization in Dihua City by relying on only a dozen bone demons and two tentacle monsters.

After all, from the beginning to now, the most powerful Black General in the Black Cavalry has not taken any action until now.

But it's okay this way.

These guys have to be kept to test the strength of the explosive beast.

It would be ugly if it was solved here.

Xia Mu thought for a moment, then looked at the Black Cavalry, which had less than half of its troops left, and followed silently.

The night before.

When Xia Mu went to the Jiaoshe Organization, Xu Xin and others also drove infantry vehicles to a tall building in District B of Dihua City as planned.

According to the original plan, the most powerful individual soldier team sent by Chen Daobin from the Western Military Region will arrive here, meet up with Xia Mu and others, and cooperate with them to investigate the news of the explosive beast.

The agreed time soon arrived, but the military team did not show up yet.

Xu Xin looked at the time on the car's electronic screen, frowned, and tapped the armrest of the leather seat, not knowing what he was thinking.

Su Xiaoshuang and Su Xiaoxiao looked at the situation outside the infantry vehicle boredly and silently wrapped their clothes tightly.

"Alas, I don't know what happened to Xia Mu. He insisted on going to that Jiaoshe Organization and left us in the car."

"Brother Mu probably has his own plans. Anyway, I think he's safe."

Su Xiaoxiao's ability is quite unique. Since even she feels that Xia Mu is safe, Su Xiaoshuang puts aside her worries.

Just at this moment, a strong flashlight suddenly lit up on the roof of a building in the distance.

The light flickered a few times in a regular pattern, then turned off again.

Xu Xin's eyes lit up. It had finally arrived. This was the signal the special team had agreed upon: three short flashes and one long flash.

She hurriedly turned on the headlights of the infantry vehicle, and two long and two short flashes of light shone out, responding to the signal.

Soon, a group of fully armed soldiers with live ammunition appeared next to the infantry vehicle.

"Captain Yin Long of the First Squadron of the Western China Military Region Special Operations Battalion reports to you."

At this time, a soldier with camouflage on his face standing at the front of the team raised his right hand and saluted.

This chapter is not finished yet, please click on the next page to continue reading the exciting content!