Chapter 4 Selling a house to raise liquidated damages



Now that she has come here, she must quickly resolve her current predicament.

It is said in the book that her parents left her a courtyard with two entrances, and the location was excellent.

Zhang Qiaoqiao’s “best friend” in Beijing and her family are likely to occupy her house.

She had to find a way to go to the county town to call one of her father's comrades-in-arms.

It was Uncle Gu who helped me to arrange my pension.

Before leaving, he left her a phone number and told her that she could contact him directly if she had any difficulties in the future.

Her parents died when she was fourteen. Both of them were martyrs. She also had a large courtyard in Beijing.

Originally, her boss was going to arrange a job for her after she graduated from high school.

Now, Zhang Qiaoqiao, for the sake of her family’s house, has tricked her original self, who had just graduated from junior high school, into signing up to go to the countryside.

In the end, the house was occupied by her best friend's family. On the train to the countryside, her money was stolen. When she arrived at the educated youth center, the little girl was in a miserable state. However, after being kindly helped by the male protagonist several times, she became obsessed with him and chased after him like a fool all day long.

Unfortunately, the hero's heart and eyes are full of the heroine. He Wan in the book is the control group of the hero and heroine. She is like a clown who is always around them, using her misfortune and bad luck to highlight the love between the hero and heroine.

Tsk tsk, that’s why Chen Qing is so hateful.

I had only been away for a few days, and Zhang Qiaoqiao's family was not bold enough to move in directly. It was not until later that Zhang Qiaoqiao's family moved in according to what the book said.

This is for sure. She has not had time to move yet. She knows that Zhang Qiaoqiao's father is very proud. Well, she has to hurry up on this matter. She turned her head and looked at the misty door next to the shelf. She thought to herself, don't worry, I will study it when I come back. Then she took the drink and left the space.

Yun Shudai in another time and space was stunned for a long time, and then slowly digested this weird scene. She might have been scared before, but now, she has experienced the experience of traveling through a book, so what is there that she cannot accept?

He opened and closed the refrigerator door, put the instant noodles in his hand back in, and there was no movement for a long time.

"What happened just now? Is there some kind of opportunity, or a fixed time required to open the door now, and talk to Pu..."

Before she could say anything, the refrigerator door that she had just opened with both hands was no longer an ordinary refrigerator. The originally bright space became foggy, and the partition between the two doors was gone, just like Doraemon's anywhere door. Yun Shudai looked at the foggy space and scratched it twice with her hands, but it was useless. She put her arm in, but it was empty, and she couldn't touch the back panel of the refrigerator door.

Just as she was about to go in and take a look, the doorbell suddenly rang. Yun Shudai's heart beat faster and she quickly closed the refrigerator. Before opening the door, she deliberately opened it again to take a look. When she found that it had returned to normal, she opened the door with confusion.

"Shushu, I called you all day yesterday, why didn't you answer? Do you want to scare your mother to death?" The moment Yun Shudai opened the door, she entered a warm embrace.

Behind him was a woman in her twenties who looked similar to the supporting actress. She said with red eyes, "You've lost your mind. You didn't even answer the phone for a man. You're dying at home. Are you going to abandon us?"

"What's so good about Jiang Yi? We will meet someone better than him in the future, my daughter."

An elegant middle-aged man behind him choked up and said, "Dad thought you did something stupid."

After saying that, he took his son-in-law and grandson to the living room.

(End of this chapter)

Continue read on readnovelmtl.com


Recommendation



Learn more about our ad policy or report bad ads.

About Our Ads

Comments


Please login to comment

Chapter List