Chapter 511 Equipment Arrival (2/2)



After the contract was signed, Li Xiuyuan looked at Wang Yonghua and said, "Mr. Wang, we can contact the machinery and equipment to prepare for the arrival of the equipment now, is that alright?"

“No problem, Mayor Li.” Wang Yonghua nodded repeatedly.

Li Xiuyuan then said, "Well, I'll have someone transfer 100,000 yuan to you later as a deposit."

"Thank you, Mayor Li, thank you, Mayor Li." Wang Yonghua was beaming with joy and thanked him repeatedly. The biggest problem with projects in cooperation with the government was the difficulty in getting funding. If Hou Peng controlled the finances, then there would be no problem.

You can just work hard and get paid as soon as you finish, but it's different with Li Xiuyuan. Whether you get paid after you finish the work is another matter. That's why Wang Yonghua insisted on giving the "remaining two bottles of wine" to Hou Peng last night. In case Li Xiuyuan doesn't pay after he finishes the work, Hou Peng will have to talk to him.

Li Xiuyuan waved his hand and then called the county environmental protection bureau to arrange for the sludge solidification equipment to be ready to enter the site. This had been arranged by the environmental protection bureau beforehand, and the total cost was 150,000 yuan.

That adds up to 580,000. In addition, the two small excavators and eight tricycles in the village will cost about 70,000 to 80,000 each, bringing the total to 650,000.

Compared to the previously planned budget of 850,000 yuan for machinery and equipment, it seems that 200,000 yuan can be saved. However, this 200,000 yuan depends on the progress of the project. Overtime work may be required, and the workload may increase.

This will also lead to additional expenses.

Once the project starts, it's like a goldmine. Li Xiuyuan knew that once the project officially began, he would only have two things left to do: one was to keep an eye on the project's progress and plan for the later stages, and the other was to secure funding.

There is a shortfall of at least one million that must be made up.

Li Xiuyuan stayed in Meilin Village all day without leaving until after 5 p.m. before returning to the town. After dinner, he pondered the groundbreaking ceremony for the next day.

Setting the groundbreaking ceremony for tomorrow is definitely a bit rushed. If everything is finalized today and construction starts tomorrow, there's no time to invite leaders over. However, Li Xiuyuan doesn't plan to invite county leaders either.

When doing work, it is of course necessary to report frequently. For Li Xiuyuan, this frequent reporting does not mean reporting to Secretary Zhang. Although Zhang Xingguo is considered a leader, he cannot determine his future or fate, so what is the use of reporting to him?

It was a report to the county government leaders.

However, Li Xiuyuan felt there was little need to report the commencement of this dredging project, since it should have been completed last year as a preliminary project, but it was only now that it was officially started.

Although I didn't cause this problem, it's not appropriate to make a big fuss about it; it wouldn't be good if word got out.

Another issue is the timing. Last Monday was the day of Jingzhe (the solar term of the Spring Equinox), and tomorrow is already March 13th. If we delay any longer, there won't be enough time. Even this is a bit rushed.

This is why Li Xiuyuan kept emphasizing the project progress to Wang Yonghua. No matter what problems arise, the project progress cannot be affected. Overtime work should be carried out whenever necessary.

Continue read on readnovelmtl.com


Recommendation



Comments

Please login to comment

Support Us

Donate to disable ads.

Buy Me a Coffee at ko-fi.com
Chapter List