The long-awaited design has finally been released.
When Lu Yuan entered the room, he saw that the map on the large screen had been planned in detail.
The perspective view clearly categorizes and labels underground pipes, cables, and other similar items, making it very convenient to view.
Upon seeing Lu Yuan enter, the chief architect in charge of infrastructure smiled at him and said, "President Lu, you've arrived!"
"Okay! Don't be shy! Just say it!"
The other person nodded: "Okay! Then I'll give a brief introduction!"
Then, the other person pointed to the projection on the wall with a small stick in their hand and said, "We plan to carry out the project in three steps!"
"The first step we need to take is to build a power plant! We'll have to use coal for the initial power plant! But there's no other way! I hope Mr. Lu understands!"
"Yes! I understand! In the early stages without electricity, we had no choice but to use coal-fired power plants! Although it might cause some pollution, there was no other way!"
The other party nodded: "Yes! We will do our best to minimize the pollution! Once the basic construction is almost complete, we will build a dam on the nearby river and create a hydroelectric power station using the water flow difference! At that time, the electricity problem will be solved! The coal-fired power plant can then be shut down!"
"Hmm! Not bad! That's a great idea! We have a river! But this is a huge project, isn't it? How long will it take to complete?"
After glancing at the people nearby, the other person said, "Based on the progress of our project and our budget of one million people, this hydroelectric power station project will require approximately 100,000 people! It will also involve many departments and require a lot of materials! It will take at least several years!"
Upon hearing this, Lu Yuan rubbed his chin: "Several years... Phew! That seems a bit long! But let's take it slow!"
Lu Yuan didn't want to dampen their enthusiasm, so he hadn't told them about his dimensional space yet. They still thought it was outside. If he were to actually build a hydroelectric power station, he would have to leave the dimensional space, and the hydroelectric power station would probably be wasted.
"Um... what if we don't build a hydroelectric power station?"
The other party was slightly taken aback: "Not building hydroelectric power plants? Are you going to keep using coal-fired power plants? But... but Mr. Lu, coal-fired power generation is inefficient and extremely polluting! I really don't recommend continuing to use coal-fired power plants!"
Lu Yuan waved his hand and said softly, "Okay! Just proceed according to my plan for now! By the way! You didn't already include this project in your plans, did you?"
The other party nodded helplessly: "Yes! We feel that this project is absolutely necessary! Without a hydroelectric power station, we will consume a lot of coal!"
"Oh! Okay! Then continue!"
"OK!"
The other party then pointed to some blue, red, and gray pipe networks on the map.
"This blue network of pipes is the route map of the water pipe network. Using our method, we can reduce our consumption of consumables! The red ones represent electricity, and the gray ones are sewage pipes! These pipes are the first ones installed when the city is built! After all, Mr. Lu, you don't want to see your city filled with all sorts of spider web-like electrical wires, do you?"
"Yes! That's right! Is everything to be managed underground?"
"Yes! The underground management is excellent! It won't affect the buildings on the surface! It can be modified later! It won't affect the aesthetics!"
"Hmm! This is good!"
Then the other party pointed to some yellow areas on the map and said, "We plan to build a batch of industrial zones in this area! After the industrial zones are built, a million idle people will have jobs! It will also resolve some of the conflicts among them! However, how to arrange it will probably have to be discussed between you, President Lu, and Chief Designer Ye Hua!"
Ye Hua nodded: "Yes! I've already discussed this with President Lu! He's set up an independent personnel management system! We'll take care of the personnel arrangements!"
"Okay! Then I'll consider this as something I'm already prepared for!"
Lu Yuan nodded in satisfaction: "Isn't the industrial zone a bit far?"
The other party smiled and said, "Not far! Not far at all! I plan to open a bypass railway line around the city! Then we will be able to use this line to transport workers to and from get off work, and this railway will be used to transport coal and other goods during the day!"
"Hmm! Not bad! Was the railway project also among the first things to be prepared?"
"Yes! The railway infrastructure needs to be built first! Otherwise, it will affect subsequent development!"
At this point, the other party looked at Lu Yuan: "Um... Mr. Lu, I have to say something! The consumption of railways is extremely huge! You need to be mentally prepared! We don't have locomotives, freight cars, or rails, which are all huge consumption items!"
"Yes! Is there any place where we can get a railway for this kind of county town?"
Ye Hua stroked his chin and pondered for a while before shaking his head: "There might be a place where it could happen! But we probably can't go there now!"
"Oh? Where?"
"upper layer!"
When Lu Yuan saw the other person pointing in the direction above their head, he was immediately stunned.
This chapter is not finished yet. Please click on the next page to continue reading the exciting content!
Continue read on readnovelmtl.com