Unexpectedly, this guy was not obedient on his back, twisting and turning and singing, singing about a sister looking for her brother with tears in her eyes.
The hateful Wan Feng wanted to throw her into the water and let her cry in the water.
After crossing the river, Wan Feng threw Luan Feng on the beach, then strode up the river bank.
Luan Feng crawled and rolled after him.
As soon as the two of them arrived in front of Xicheng's house, they saw two old-style Jiefang trucks driving on the main road leading to Shutun in the south, with clouds of dust rising from the rear of the trucks.
Wan Feng’s first thought was that Zhang Hai had bought back the equipment from the brick factory.
"It must be the equipment Zhang Hai bought. Let's go and take a look."
He ran towards the west ditch.
When Wan Feng and Luan Feng ran to the brick factory panting, almost all the adults and children in the Wahou team gathered there.
In those days, a car in the countryside would attract children to chase it like crazy, let alone the two cars that appeared at once in the valley.
One of the vehicles had a crane arm behind the cab, which became a puzzlement in the children's minds.
Wan Feng visually inspected the machine on the truck and found that the cutting machine that could be pulled by two old Jiefang trucks should be the largest one, which could cut more than a thousand water billets per hour.
Seems zero.
But looking back at the six-hole kiln, it does match well.
Zhang Hai ran around with a beaming face, shouting loudly from time to time, and arranging people to cook.
Wan Feng saw Zhu Ping also smiling slightly, his eyes seemed to be casually scanning the crowd.
He must be looking for Jiang Xue. He must be extremely hungry and thirsty after being away from home for seven or eight days.
One of the two Jiefang trucks was equipped with a five-ton crane. It took about half an hour to unload the machines from the truck, and then it took another half an hour to lift the machines onto the workbench that had been set up in advance.
Three workers also came with the vehicle. When the crane lifted the machine onto the workbench, these workers began to install it.
Wan Feng hid in the crowd and did not move forward. At this time, he was useless and was at best just a spectator.
In the end, the machine was installed by three workers with the help of a crane and it took only a few seconds to install it by noon.
Zhang Hai took the workers to eat, and the team's electrician took this opportunity to connect the machine to three-phase electricity.
After finishing the meal, I started the engine and tested it nervously.
The cutter consists of two machines: a mixer and a cutter.
The mixer is responsible for mixing the clay and water and then transporting them to the cutter through the auger, and the cutter cuts out pieces of water-based blanks.
The trial operation of the machine went smoothly and the cut water blanks were very standard.
After the machine cut out hundreds of water blanks without any problems, the transaction was completed and the masters went home.
After Zhang Hai sent those masters away, he pulled Wan Feng out from the crowd.
"Nephew! Now that we have the machine, can we do it?"
"The cut bricks can be dried. It is necessary to cut more bricks in advance and dry them in the shade. But the bricks alone are useless. Without coal, these bricks cannot be turned into red bricks."
Zhang Hai slapped his head and said, "Forget about it. It's not a problem. I'll go to the commune to see the leader tomorrow."
"And cement! I think Ming Xiao Dexiang should have sent the mold over. It's useless to have the mold without cement."
These are Zhang Hai's responsibilities, Wan Feng can't help.
"Okay, let's solve it together tomorrow."
If Zhang Hai gets mad, he will never turn back until he hits the wall. He hurried to the commune early the next morning and hurried back at noon.
Xiao Dexiang delivered the mold the next afternoon, and Zhang Hai happened to come back for inspection.
These have nothing to do with Wan Feng, he can't do anything about it at school.
Wan Feng had no idea how the commune supported the village-run enterprises. After all, he was not involved in the matter and it was all handled by Zhang Hai.
Anyway, the commune really tried its best to support it, because on Wednesday morning, coal and cement entered the brick factory site.
A total of five old-style Jiefang trailers arrived, but only one truck carrying five tons of cement.
The shelf life of cement is quite short, especially now that the rainy season is about to begin. If it is stored for too long, it will become spoiled and hard.
Therefore, only five tons were needed, but these five tons of cement were enough for them to experiment with cement bricks and tiles.
Although the brick factory had machines and coal, it did not produce a single red brick because the cut bricks were not good enough to be put into the kiln.
The water-bricks contain a lot of water when they are cut. If the water is not evaporated to a certain extent, the red bricks fired from these water-bricks in the kiln will be relatively soft, that is, not hard enough.
If it's not hard enough, can it still be called a brick? Who would buy such a brick?
In 1980, the dryer was just a legend. Even if it was not available on the market, the Wahou Brick and Tile Factory would not be willing to spend the money given its financial strength.
Therefore, these water blocks can only be dried using the ancient method of ventilation and shade drying.
The water blocks cut from the machine are neatly stacked on the site. A certain gap is left between each water block to facilitate ventilation, and the distance is usually about three centimeters.
The height of the water blank stack is generally six layers. If it is stacked higher, the water blank will be deformed due to the influence of gravity.
Then add straw curtains to block rain and direct sunlight.
Usually, it takes five to seven months in the summer when the weather is good, and ten to half a month in the winter to dry these water blanks to the point where they can be put into the kiln.
As Wan Feng expected, this cutting machine can only cut out 1,100 water-based billets per hour, and only about 10,000 water-based billets per year.
The six-hole kiln in Wahou can hold 60,000 water-bricks at a time. When this machine works for ten pieces, it needs to work continuously for six to fill the kiln.
But this is not a problem. It takes nearly a month for a kiln of bricks to be produced from the time they enter the kiln to the time they come out of the kiln. Before they come out of the kiln, this cutting machine is enough to produce enough water bricks.
These machines behind the depressions are running almost from morning till night, producing water blanks at a rate of ten thousand per unit.
Others were experimenting with cement bricks and tiles using molds.
Today is June 11, 1980, a Wednesday.
The school was closed as usual on Wednesday afternoon. After returning home from school, having lunch and taking a bath in the river, Wan Feng suddenly felt a little bored.
I felt so restless in my heart, as if there were weeds growing in it. I don't know what had happened to me but I thought of Luan Feng.
It seems like I haven't seen this monkey for three days. Should I go see her?
This thought startled Wan Feng. Why would he think of her? Did I fall in love with her?
This is unscientific!
In order to make Lin Xiao realize this, Wan Feng began to enumerate Luan Feng's faults.
She was impulsive, rude, and had a bad temper. She also liked to touch him, pinch him, and had violent tendencies...
Hey! Why the hell, the worse she is, the more I want to see her?
Damn it! Was I bewitched by her? No, in order to test whether he was bewitched by her, Wan Feng decided to go see Luan Feng and see how she was doing.
That's a good reason.
Continue read on readnovelmtl.com