Chapter 110
[Boss, this is fine, but the location you posted is on the opposite side, on the side of the highway, and the road may need to be rebuilt.]
Lin Nan understood.
Because highways are national property, everything is planned and cannot be moved privately, so you need to inform the highway administration and apply before you can move.
This is a minor problem.
Lin's father often dealt with the Highway Administration, so it wouldn't be too difficult. So after sending a message to Lin's father, Lin Nanzhi replied to the partner.
[Don’t worry about this. Finish the other things first. I’ll ask my dad to apply for it. After that, you guys can finish the highway first. You can take your time with the Ferris wheel.]
[OK.]
After putting away his phone, Lin Nanzhi walked back leisurely.
But the distance is too far, and it is too troublesome to walk on two legs. Lin Nanzhi feels annoyed just thinking about it. If tourists come here to play, they will be so tired under the scorching sun and the cold wind. They will definitely not choose to come next time.
Thinking of this, she felt that it was necessary to get a vehicle like the ones used in amusement parks. One type was a tourist bus, a small car with four wheels that could only seat six people, including the driver, but there were also cars that could seat four.
This type is electric, has little pollution, is easy to operate, and you can drive it yourself or let your staff drive it.
The amusement park is more concentrated, so you don't need too many. However, the distance from the parking lot to the amusement park and then to the Ferris wheel is not short, so you can just put them in these three places.
Thinking of this, I quickly sent the idea to my partner.
Lin Nanzhi was Party A and the partner was Party B, so naturally they had to do whatever Lin Nanzhi asked for. They quickly agreed, then replanned and sent the new plan to the contractor.
Fortunately, they only added a Ferris wheel in an area where construction had not started and parking spaces for sightseeing buses in three places, instead of adding work in an area where construction had already started. Otherwise, if it was something else... he would have had to change it.
Back to the inn.
Bayue was lying lazily on a stone in front of the inn. When he saw Lin Nanzhi, he just glanced at him, closed his eyes and continued to sleep.
That’s right. Since Lin Nanzhi brought it back, he actually didn’t take care of it much. Instead, it was his mother who took care of it more. Now it has become a tourist attraction in the tourist area. No wonder it doesn’t like him.
Ignoring August, Lin Nanzhi entered the inn and helped.
Now is the time when lotus flowers are in full bloom, and many people come here. Many of them see the construction of the amusement park when they come here, and ask a question or two. After getting the answer, they say they will come to play again in the future.
Naturally, Lin's mother agreed with a smile.
——
Father Lin acted quickly and got the application the next day. Lin Nanzhi sent it to the partner, and the construction team started construction the next day.
The site is still some distance away from the highway, and the highway is built on the mountain. If a passage is dug, there is no need to raise the highway, but it still needs to be dug and rebuilt so that the highway has support and does not fall down.
The old highway cuts across the amusement park, but the villagers have moved away, so they just repaired the highway, so that cars wouldn't block the road when it opens. At the current highway intersection, only a section of the existing connection can be repaired, and then the highway is blocked to allow them to pass through the old road.
There is no wall around the tourist area here, so you can pass through it smoothly. When you reach the tourist area intersection ahead, you can get on the highway again from the ramp.
About a month later, the expressway was completed and several two-lane ramps were built to allow vehicles to get on and off the expressway, and also to provide convenience for villages that were far away and had not yet relocated.
In order to prevent anyone from sneaking into the amusement park, the entire venue was surrounded by high walls.
Of course, except for the side and two sides facing the highway, the rest of the area is covered with forest, so wire mesh was installed.
The gate of the amusement park is also installed at the beginning, and it is operated separately from the tourist area, while the Ferris wheel and the sea of flowers are separate.
Now that the fence has been built, it is inconvenient for the village a few miles away from the amusement park. There are quite a lot of people in that village. Therefore, Lin Nan knew that this matter was because of her. If she hadn't built it, it wouldn't have stopped people. Although she bought the land and the road herself, it didn't matter either way, but she felt that her conscience would be guilty. So she contacted an excavator and dug a road from another place.
The village is located halfway up the mountain, surrounded by mountains on three sides and a cliff on the other side, so we dug from the mountain on the right side of the village, close to the amusement park. However, it is back-to-back with the amusement park, and the excavation directly connects to the highway ramp and the old road.
As for paving, that is not Lin Nanzhi's business. Before, it was a dirt road, and it was very narrow. Now she has widened the road and compacted the road surface. She is not responsible for anything else.
Don't say that she has a bad heart, but that she dares not to be good.
The villagers always quarrel over trivial matters, let alone such a big thing as road repair. She could help them repair the road, but these people would not be grateful and would not take good care of it. Maybe they would blame her for not repairing the road when it was damaged in the future. So she should just forget it.
The goal was to build a road, and it was the village chief who organized the villagers to build the road.
In one month, the amusement park was completed because there were not many people working on the road and many people working on the amusement park. The next step was to decorate the amusement park. The outer wall, the ground leveling, the laying of cement, the planting of some green plants, the installation of colored lights and night lights, etc., were all big projects.
The Ferris wheel and the giant windmill are both ready.
The Ferris wheel is located higher, while the windmill is smaller and closer to the tourist area, on a small mountain. The land has been plowed by machines and made into a nice shape. Some water mixed with spiritual spring water is irrigated by machines to let the land grow for a few months. Planting will be done in the spring of next year, and the soil quality will be much better.
As for the area near the highway, Lin Nanzhi spent a lot of money to buy some tassel tree seedlings, irrigated them with spring water, and they grew very tall overnight. He planted them inside the wall together with the walnut trees, which not only provided viewing experience but also served as an aesthetic feature.
Of course, for fear of pollution, the fence was built a little wider and it is still some distance away from the highway.
Unfortunately, tassels are too expensive and hard to come by. Even artificially cultivated saplings are expensive. In the end, we bought thirteen trees and planted them all facing the road. The green plants in other places were all ornamental trees of varying prices, such as taller Sophora japonica, Ginkgo, Sophora japonica, wax trees, and other small trees such as maple leaves, evergreen trees, cedar, red maple, and bamboo.
At the same time, Lin Nanzhi also had a small building built near the flower sea and the sightseeing bus stop. It didn’t need to be too big, just three floors. The first floor was used as a store to sell some drinks and collect fees for the flower sea and the Ferris wheel. The second floor was a private seat for rest, and the third floor was an observation deck.
Continue read on readnovelmtl.com