"this……"
"Stop the pipe a bit. Ugh, you guys are really making my head spin. When you're cutting it, be careful to provide some support for the pipe, otherwise if the pipe slides down, the valves are all standard parts, how are you going to fit them in?"
"Yes, yes, that makes sense."
"Please put yourselves in a little more effort! How can I feel at ease if things continue like this? If you continue like this, I'm going to talk to your superiors about this. You're not doing things my way at all..."
"Mr. Wang, please don't be angry. We will definitely make changes after we go down there."
"Here's what we'll do: you all follow me, take a pen and a notebook, list out all the problems, and then work out solutions for each one. Once you've confirmed everything is correct, you can then work together to make the necessary changes."
"Okay, okay, Xiao Wang, go get that notebook from my bag, and remember to bring a pen too."
"good."
A young man ran out.
They quickly came downstairs with a pen and notebook.
"Make sure you remember this check valve. At the inlet position, you should be using a butterfly valve, right? But you're using a gate valve. With such high water pressure, how are we supposed to turn it? This needs to be replaced too. The distribution cabinet here needs to be waterproofed. Otherwise, if it rains heavily and water washes onto the distribution cabinet, it will burn everything."
"These wires need to be run through conduits or fixed to the wall. What if someone trips and falls if you just walk directly behind the equipment? Also, why aren't these distribution cabinets grounded? We get so many lightning strikes here in the summer, how are we going to handle that?"
"Look again, the foundation of this pump isn't level either. Go down and use a level to check. In this condition, once the pump is running at full speed, it will vibrate violently. How can it be used then? I'm afraid the pump will be damaged beyond repair in just a few days."
"The valves need to be clearly labeled, as do the pipes and pumps. You know what each pipe and valve is now, but what happens after you leave? How will we know? This includes all the switches and knife switches in the electrical room; they all need to be clearly labeled..."
"You should also prepare some wrenches for these ball valves. There are over a hundred ball valves, what can anyone use to turn them? These are basic items that should be included, right? You need to be meticulous in your work..."
Wang Tianxiao spoke at length.
Engineer Xu's forehead was covered in cold sweat.
He thought to himself, "This Boss Wang is really something else."
How did he come to know so much?
Generally speaking, engineering projects that are not specifically designed for factories tend to be as simple as possible.
Because adding an extra task, and doing it in more detail, will increase costs significantly.
Higher costs will reduce profits.
Therefore, they often try to find ways to reduce the cost of terminating the contract from various aspects.
Generally speaking, because what they do involves technological monopoly and they are in an absolutely advantageous position, not many people can offer any meaningful opinions.
Even if they are mentioned, they are all very simple matters that are easy to resolve.
But this Mr. Wang in front of us is not someone to be underestimated.
Every suggestion he made was so reasonable and necessary that they had no way to refuse.
If they decline, it means they are not professional.
This is absolutely unacceptable.
Wang Tianxiao walked from the pump house to the ground and pointed to the area in front of him, saying, "This pump house needs to be waterproofed, and the reference level should be slightly higher. Since you've built an underground pump house, you need to prevent the risk of flooding. Let me ask you, if there's a flood coming from the valley, with your design, won't the pump house be submerged very quickly?"
"The pump house is already located at a higher elevation than the valley, so there shouldn't be any problems, right?"
“Generally speaking, there shouldn’t be a problem, but what if there’s a flood?” Wang Tianxiao said irritably. “Look at those pit-dwelling courtyards in Qingcheng. They have seepage pits underneath, so they shouldn’t flood, right? Then why did so many people die?”
"this……"
“When you’re doing engineering, you should think things through more thoroughly. Once you’ve taken this money, you’re not just doing the work; you also have the responsibility of providing technical guidance.”
Wang Tianxiao said this, then looked up at the pipes above and said somewhat dejectedly, "You can check the rest yourselves. Check each item according to my inspection standards, and give me the list after you've finished. I'll confirm it before you make any changes."
I was hoping to get the water running today, but it looks like that's impossible. I'm only giving you two weeks. If it's not finished by then, we'll stick to the contract. Don't forget, construction contracts have time limits; they can't just keep delaying like this.
"That's right, half is enough."
Engineer Xu nodded repeatedly.
"Alright, that's enough for today's inspection. I have some things to do. You can take a look at the rest yourselves."
As Wang Tianxiao was leaving, he saw that everyone was on high alert and realized that he had spoken too harshly. So he softened his tone and said, "Of course, I'm only talking about the issue, not the person. There were some problems with our cooperation before, and both sides were responsible. I will communicate more in the future. I will come every three days, or you can come to the station to find me anytime. If there is anything, just tell me immediately, and we will solve it together."
When Wang Tianxiao returned to the depot, Li Yali noticed that he wasn't in a good mood and asked him if the water delivery wasn't going well. Wang Tianxiao nodded.
He couldn't discuss the details with his wife, so he could only give a general overview of the issues.
Continue read on readnovelmtl.com