Chapter 703 Super Barrier



If he spotted any flaws, he would immediately call the responsible worker, sternly point out the problem, and explain in detail how to correct it until the welds were secure and up to standard. He would occasionally visit the insulation laying area, crouching down to carefully examine the gaps between the materials, measuring their width with a ruler to ensure they were within the design tolerances. If the gaps were too large, he would order the workers to re-lay the materials, with no room for error. Xiao Yi would also regularly review the construction drawings, comparing them with the actual on-site conditions to ensure the exact dimensions and placement of every structure. He liaised closely with the engineers, discussing construction difficulties and solutions, never missing a single detail that could affect the quality of the work. Under the scorching sun, beads of sweat covered Xiao Yi's forehead, but he didn't bother to wipe them. His eyes were fixed on every step of the construction, not missing even the slightest deviation. His voice was clear and powerful amidst the clamor, directing the orderly progress of the work. Under his supervision, the workers worked even more diligently and attentively, fully aware of Xiao Yi's strict quality standards and daring not to slack off. Xiao Yi's presence filled the entire construction site with a tense yet orderly atmosphere, ensuring that every link met the high design requirements and providing a solid guarantee for the smooth progress and high-quality completion of the project.

While external defenses were being constructed, improvements were also underway within the base. Inside, one could see a bustling and orderly atmosphere in every area. The once spartan space was gradually taking on new life and vitality. In the accommodation area, workers were redesigning and renovating the rooms. Dated walls were repainted, creating a clean, white, and uncluttered look. New beds were gradually installed, each with a soft, comfortable mattress, providing a better resting environment. The lighting in the rooms was also upgraded, creating a bright, yet soft, warm and inviting atmosphere. In the public areas, new floor tiles with intricate patterns were being laid, featuring non-slip and wear-resistant finishes. Workers were also installing new ventilation equipment to ensure smooth air circulation and fresh air. Recreational facilities were also being gradually expanded, offering everything from fitness equipment to multimedia equipment, enriching residents' leisure time. In the warehouse area, shelves were reorganized and reinforced, allowing for more orderly and organized storage of goods. Clear signage ensured quick and easy access to needed items. Furthermore, fire and moisture-proofing measures were being continuously improved to ensure the safe storage of supplies. In the kitchen area, new stoves and kitchenware have been introduced, significantly improving cooking efficiency. The sink and drainage systems have been optimized, eliminating water accumulation and blockages. Temperature and humidity in the food storage area are now strictly controlled to ensure the freshness and hygiene of ingredients. In the office area, desks and chairs have been replaced with more ergonomic designs to reduce employee fatigue. Network and communication equipment are also being upgraded to improve work efficiency and the speed of information transmission. Optimization work is proceeding intensively throughout the base, and positive changes are taking place in every corner, creating a more comfortable, efficient, and safe living and working environment for everyone.

The ventilation system was redesigned to better control the flow and distribution of heat. Engineers gathered around tables piled high with blueprints and data, and after countless discussions and calculations, they finally drew up a blueprint for a completely new ventilation system. Following the design, construction workers first carved precise channels into the walls and ceiling of the base. The dimensions and angles of these channels were carefully considered to ensure smooth airflow. New ventilation ducts were installed one by one, constructed from high-quality metal, ensuring a sturdy and well-sealed structure. At the joints, workers used special sealants and fasteners to ensure no gaps, preventing heat leakage. Intelligent regulating valves were installed at key points. These valves automatically adjust ventilation volume and direction based on temperature and humidity fluctuations in different areas. When temperatures in a particular area are too high, the valves increase ventilation to quickly dissipate excess heat; when temperatures are too low, they reduce ventilation to maintain a stable heat level. High-powered fans were also installed to enhance ventilation. These fans are running, making a low and powerful humming sound, pushing the air to flow quickly throughout the system. At the same time, the speed of the fans can be intelligently adjusted according to actual needs to achieve a balance between energy saving and high efficiency. At the end of the system, a high-efficiency filter is set

Insulating the rooms is also being intensively carried out to ensure that heat doesn't escape easily. Workers busily move from room to room, carrying various insulation materials and tools. First, they apply a special insulating coating to the walls. This thick, fine coating is evenly applied to form a dense, protective film. Next, thick insulation panels are carefully attached to the walls. These panels are made of high-performance insulation material, lightweight yet highly effective. Workers meticulously align the edges of each panel and securely fasten them to the wall with specialized glue and rivets. The area around the windows is a key area for insulation. Workers install double or even triple-layered insulated glass, creating an air gap between the panes that effectively prevents heat transfer. Gaps in the window frames are sealed with sealant, eliminating any possible channels for heat leakage. On the ceiling, insulation blankets are neatly laid, like a soft cloud covering overhead. Insulation mats are also laid beneath the floor, effectively protecting the room's heat. The workers paid particular attention to easily overlooked areas like corners and door edges. They meticulously filled them with small pieces of insulation, ensuring no corners were left untouched. The entire room seemed enveloped in a warm, protective shell, with every detail meticulously considered to lock in precious heat and prevent it from escaping.

This chapter is not over yet, please click on the next page to continue reading!

Continue read on readnovelmtl.com


Recommendation



Comments

Please login to comment

Support Us

Donate to disable ads.

Buy Me a Coffee at ko-fi.com
Chapter List