The shoe factory was settled and the garment factory also began to relocate.
The relocation of the garment factory was much larger than that of the shoe factory. After all, the shoe factory only had about 300 employees, while the garment factory now has more than 1,500 employees.
When the women working in the garment factory saw that the new factory was much larger than the previous one, they started having fun in the yard.
If you throw a man among them at this time...
The consequences are unimaginable.
When the garment factory moved, Wan Feng was not there. He was in Heijiao taking over the first phase of the automobile factory.
September 20th is the planned reception day.
The first phase of the automobile factory includes three workshops, an office building, a warehouse and thirty residential buildings.
The remaining three workshops, thirty residential buildings, the factory's greening and a small part of the remaining wall will have to wait until next year.
Wen Guanghua also followed Wan Feng to Heijiao for inspection. When all the trucks were moved here, this would become his main battlefield.
The three usable workshops were to be equipped with three truck production lines, one line each for pointed and flat heads and small dump trucks. He had to design how to install them himself.
Wan Feng visited the workshops, office buildings, warehouses, and finally came to the residential area.
There are a total of fifty residential buildings in this residential area, and thirty of them have been completed and constructed by First Construction Company.
Strictly speaking, the residential area is separate from the factory area and forms an area in itself.
Three of these buildings will be used as dormitories this winter because there are more than 2,000 people coming from Nanwan Group.
Including the people recruited locally in Black Lagoon, there will be more than 3,000 people living here for the time being.
As for those with families, we can’t take care of them this year. Let’s wait until next year.
Next year, there may be thousands or even tens of thousands of people living here.
How can a truck manufacturing company with less than 18,000 employees have the nerve to go out?
“How many truck lines have been built?”
"For now, we've built a pointed one, plus the dump truck line. These are the only two lines we'll install this winter."
Building production lines is a problem now. So many production lines need to be built one by one, and this cannot be done without professional companies.
Once the garment factory moves out, the production line will be separated immediately and staff will be added, otherwise the speed will be too slow.
It seems that this class of technical school students is about to graduate, so we might as well cram all the graduates who want to stay in Nanwan Group into it. There are more than 200 people in total.
That’s it!
Wan Feng signed the acceptance letter for the first phase of Nanwan Automobile Project.
Tan Chun's face was wrinkled with smile. With Wan Feng's signature, he could go to the financial department of Nanwan Group to get the money. Including the material costs and labor costs, it would be several million.
“When will the second phase be completed next year?”
"Phase two will be easy. One less office building will save a lot of time, and it's guaranteed to be completed by August next year."
"You're bragging again. You told me this year's issue would be finished in September. What month is it now?"
"September!"
Today is September 20th, isn’t it September? Although there are only more than ten days in October, it is still September.
"You've got it covered."
After taking over the project, Wan Feng drove to the beach.
The pad on the beach is more than a hundred meters away from the original shore.
One dump truck after another reached the edge of the pad, turned around and backed the truck to the seaside, then raised the truck bed and dumped the earth and rocks down.
After the dump trucks that had dumped the earth and rocks left, bulldozers pushed the soil piled on the side into the sea.
Wan Feng calculated that these cars could still work for more than two months and would have to be parked at the end of November.
It is estimated that in two months, the port can be advanced 200 meters into the sea. The length of the port coastline is 5,000 meters.
This is only one million square meters, or one square kilometer.
The port's padding area is three square kilometers. Damn! We've only been able to fill one-third of it this year, and it won't be easy to fill it all next year.
It’s a pity that these dump trucks are a bit small. It would be better if they had a double-axle 6X4 dump truck, which would be faster.
It is too late to design a double-axle 6X4 dump truck now.
Once the design is completed and produced, the project here will probably be finished.
Wan Feng stayed at the beach for more than ten minutes and then drove to the foot of Yushan Mountain.
The Jade Mountain, which looked quite majestic in the summer, has been stripped of half its remains.
Dump trucks were lined up one by one waiting to be loaded.
There are five forklifts and an excavator loading the dump trucks. On average, one forklift can load one truck every two to three minutes.
This is one of the soil excavation sites. There is another soil excavation site on the east side of the port, where more than a hundred dump trucks are working.
Wan Feng parked the pickup truck aside and walked over to Yu Qingtao who was standing on a big rock.
"Come down, you won't be afraid of falling unconscious."
Yu Qingtao, who had been watching the forklift loading materials, only then noticed Wan Feng and hurriedly jumped down from the rock.
"Why are you here today?"
"The first phase of my factory was completed today. I came to take over. After I finished taking over, I came to see how my dump trucks are doing."
"Not bad, not bad. One cubic meter of soil weighs over 3,400 kilograms, and five and a half cubic meters is over 19,000 kilograms, nearly ten tons. We've been running 22 or 3 times a day for over three months, and not a single one has had any mechanical problems. Your truck is well built."
If a new car breaks down after three or four months, what's the point of building it?
"Which excavator?"
"Nothing's wrong. The digger is still faster. Now the kid's hands are almost trained. He can turn the digger over in two buckets. He can load nearly 40 trucks in an hour. The forklift is slower."
This is so fresh. A bulldozer shovels, and an excavator digs. Their working methods are completely different.
"If I were to do a project like this again in the future, an excavator would still be the best choice."
"We've modified this excavator. Otherwise, the original one would have broken down a long time ago. Are you interested in modifying two more for you?"
"Oh! A shovel is a good thing, but it's too expensive."
"Haha! We're just getting started now. In a few years, a domestically produced excavator will cost 600,000 to 700,000 yuan. An imported Japanese large excavator will cost nearly 2 million yuan, and a small one will cost over 1 million yuan."
Yu Qingtao blinked. "According to what you're saying, I only bought two and it won't be a loss in the future, right?"
"Of course it's worth it. In a few years, the work of a digger will cost over a hundred dollars an hour. In a place like your Black Lagoon, you need diggers to maintain and build shrimp pens, scallop pens, sea cucumber pens, etc."
"I know this scallop ring, but what is this sea cucumber ring? Can you raise sea cucumbers?"
By 1991, people were already raising shrimps and scallops, but it would take some years before we could raise sea cucumbers.
"Why not? If we need to raise whales in the future, it won't be a problem."
"That's bullshit! I believe you about raising dolphins, but raising whales? I can't even afford it if I break the bank."
I just said that, but you took it seriously.
Continue read on readnovelmtl.com